Cl-Sb-23A-01t 2 Pole 3 Cont. Top Set J-Lead Silver Contact 2mm Knob Slide Switches

US$0.55
100-999 Pieces
US$0.48
1,000+ Pieces
Port:
Hong Kong, Hong Kong
Production Capacity:
100000PCS
Payment Terms:
T/T

Last Login Date:

Aug 26, 2025

Main Products:

PCB, PCBA, Electronic Product Design, IC Programming, IC Chip, Diodes and Transistor, SMT, DIP, LED, FPC

Find Similar Products

Product Description

Company Info

Basic Info.

Model NO.
CL-SB-23A-01T
Gender
Male
Pin
8 Pins
Application
PCB
Certification
RoHS
Terminal Material
Copper
Interface Type
HDR
Packaging
1000PCS
Use
Electronic Products
Retail
Supply
Other Components
Supply
Electronics Wires
Supply
Diode
Supply
Transistor
Supply
Develoment and Design
Supply
Resistors
Supply
Capacitors
Supply
Connectors
Supply
Sensor
Supply
Transport Package
Box
Specification
250*250*100mm
Origin
Chuina
HS Code
8541100000

Product Description

Illuminated:Non-Illuminated 
Lamp Type:- 
Contact Form:DP3T 
Switch Function:ON - ON - ON 
Contact Current Rating:200 mA 
Current Rating:200 mA 
Voltage Rating DC:12 VDC 
Termination Style:J Form Lead 
Actuator:Slide 
Mounting Style:SMD/SMT 
Contact Plating:Silver 
Series:CL-SB 
Packaging:Reel 
Packaging:Cut Tape 
Actuator Length:2 mm 
Actuator Style:Flush 
Brand:Nidec Components 
Contact Material:Copper Alloy 
Flammability Rating:UL 94 V-0 
Life:10000 Cycle 
Maximum Operating Temperature:+ 85 C 
Minimum Operating Temperature:- 40 C 
Mounting Angle:Horizontal 
Product Type:Slide Switches

   


 Shenzhen haodley Technology Co.,Ltd provides one-stop BOM service / electronic components sell .


Q1: What services do you offer?

We provide turnkey solutions including R&D, Components,PCB fabrication, SMT, testing, and other value-added services.

Q2: What files are required for a quotation?

 please provide Type, designation and specification/files, a Bill of Materials (BOM).For a PCB quotation, please provide Gerber data/files and any relevant technical requirements or special requests. For a PCBA quotation, please provide Gerber data/files, a Bill of Materials (BOM), and test instructions/procedures if functional testing is required.



Q3: How long does it take to receive a BOM quote?

Typically, it takes 12 to 48 hours for our internal engineering team to evaluate and confirm your quote.

Q4: How do you handle fluctuations in electronic components and inventory management for IC products?

 We have stockpile.
 We work closely with our clients and suppliers to ensure timely updates and flexible solutions to accommodate these changes.

 
 
Send your message to this supplier
Mr. Devin Lin

Post a Sourcing Request Now

People who liked this also liked
Get Quick Quotes